CLEAR FEES, BEFORE YOU APPLY
Campsite certification costs
See the application fee and current annual site membership tiers, then budget for the practical costs of running your campsite.
Application fee: £25
There is a £25 application fee. This is refundable if we are unable to certify your site. The application explains the payment process. The application fee is separate from annual site membership and does not itself authorise the site to operate.
Annual site membership fees
The following are Go Explore’s current annual membership tiers. The tent bands describe the pricing tiers; your site’s actual permitted use and capacity are determined through assessment and the certificate.
| Tier | Tent pricing band | Annual fee |
|---|---|---|
| Tier 1 | Up to 9 tents | £395 |
| Tier 2 | Up to 21 tents | £795 |
| Tier 3 | Up to 30 tents | £1,695 |
| Tier 4 | No pricing-tier tent cap* | £3,495 |
*Tier 4 is described as “unlimited tents” in the membership offer. This is a pricing description, not permission for unlimited site capacity. Every site remains subject to assessment and its approved arrangements.
These are annual site membership charges, not nightly pitch fees. Your offer will identify the applicable tier. If you propose to change the size or use of your site, speak to us before changing your operation.
How do caravan pitches fit in?
Tent bands must not be read as a total allowance for caravans. A paragraph 5 approved site has a combined maximum of five caravans, campervans and motorhomes at any one time. Tell us your proposed mix when applying so the appropriate arrangements can be assessed.
For a caravan-only proposal, ask us to confirm the appropriate membership offer rather than assume the tent bands determine the whole approval.
What else should you budget for?
Getting the site ready
- Any necessary professional advice and permissions.
- Safe access and the agreed site layout.
- Water, toilets and waste arrangements.
- Signs and clear arrival information.
Running the campsite
- Suitable insurance for the operation.
- Cleaning, utilities and maintenance.
- Waste collection and service checks.
- Staff time, payment costs and marketing.
The scale of these costs depends on your land and the facilities you choose. Certification fees do not include building work, infrastructure, insurance or third-party services. Obtain site-specific quotations before committing to expenditure.
Compare the whole offer
When choosing a certification provider, compare the permitted operation, renewal arrangements, practical support and total cost. A low headline fee is only useful if the arrangement fits the site you intend to run.
Already with another club? Use our switching guide to prepare the information needed for a Go Explore assessment. For a new site, start with the landowner’s checklist.
Confirm your proposal before spending
Fees shown were checked on 16 November 2026. The application and your written offer set out the arrangements for your site. Contact us if you need clarification about your proposed mix of accommodation or an existing membership.
Ready to explore your site’s potential?
Tell us about your land, your proposed pitches and the experience you want to offer. We’ll review the details and explain the next steps.